MEP Estimating for Tenant Improvement Projects

Tenant improvement (TI) projects, the fit-out of offices, shops, restaurants and clinics inside existing buildings, are a steady source of work for MEP contractors. They are smaller than new construction, but they carry more uncertainty. You are working with existing systems, building rules and tight schedules. Here is how to approach MEP estimating for tenant improvement projects.

Read the existing conditions first

TI drawings usually show demolition and new work on separate sheets, or with different line types on the same sheet. Before counting new devices, study what must be removed, what stays and what gets relocated. Check whether the existing panels, water heater, rooftop units and ductwork have enough capacity for the new layout. If the drawings say “verify in field”, note it as a risk or an allowance in your bid.

What to include in a TI MEP estimate

Electrical

  • Demolition and make-safe of existing circuits and fixtures
  • New lighting, lighting controls and emergency or exit lighting
  • Receptacles, data rough-ins and furniture feeds
  • New or modified panelboards and circuit breakers
  • Fire alarm device relocations, often done by the building’s own vendor

Plumbing

  • New restrooms, break rooms or kitchen fixtures
  • Saw-cutting and trenching the slab for new waste lines, and patching it afterwards
  • Connections to existing water, waste and vent lines
  • Grease interceptors for restaurant fit-outs

Mechanical and HVAC

  • Relocating or adding diffusers, return grilles and VAV boxes
  • New ductwork branches from the existing mains
  • Thermostats and controls tied into the building automation system
  • Exhaust for restrooms and kitchens, and testing and balancing

Hidden costs on TI projects

  • After-hours work. Many occupied buildings only allow noisy work, shutdowns or core drilling at night or on weekends.
  • Building-required vendors. Some landlords require their own fire alarm or controls contractor.
  • Shutdowns and tie-ins. Draining risers or shutting down power to other tenants needs planning and extra labor.
  • Access. Freight elevator schedules, parking and material storage slow the crews down.
  • Ceiling space. Crowded ceilings with existing ductwork and piping make new work slower than on new construction.

Price TI labor differently

Labor units from new construction often underestimate TI work. Demolition, working around existing systems and short work windows all reduce productivity. Adjust labor for these conditions instead of using the same rates as a new building.

Get a TI estimate

MEP Estimation Services prepares takeoffs and estimates for office, retail, restaurant and healthcare fit-outs across the United States. We cover electrical, plumbing and HVAC, and we show demolition and new work separately on marked-up drawings. Send your plans for a free quote.