MEP Bill of Quantities (BOQ) Preparation Services

A bill of quantities (BOQ) lists every measurable item of work in a consistent structure, so that bidders price the same scope and owners can compare bids line by line. We prepare MEP BOQs for electrical, plumbing, HVAC and fire protection work, for contractors, developers, owners’ representatives and design teams across the United States.

When You Need an MEP Bill of Quantities

  • Bid packages: give every subcontractor the same quantities so bids can be compared fairly.
  • Owner and developer budgets: check design-stage costs before the project goes out to bid.
  • Schedules of values: break the MEP contract into measurable items for progress billing.
  • Change orders: document added or deleted quantities between drawing revisions.
  • International-format bids: projects that call for a formal BOQ rather than a lump-sum estimate.

How We Structure Your BOQ

Unless your project specifies another format, we organize MEP BOQs by trade and system, following CSI MasterFormat divisions commonly used in the US:

DivisionScope
21Fire suppression
22Plumbing
23HVAC
26Electrical
27Communications
28Electronic safety and security

Each line includes an item number, a clear description, the unit of measure and the quantity. Items can be grouped further by building, floor or area. We can leave rate and amount columns blank for bidders to fill in, or price them for you.

Priced or Unpriced BOQ

  • Unpriced BOQ: quantities only, issued to bidders as part of a tender or bid package.
  • Priced BOQ: quantities with material, labor and total costs for your project’s location, useful as an engineer’s or owner’s estimate to check bids against.

What You Receive

  • An Excel BOQ with item numbers, descriptions, units and quantities
  • Color-coded marked-up drawings showing where each quantity came from
  • A list of assumptions, exclusions and items needing clarification from the design team

How It Works

  1. Send your drawings and specifications, plus any BOQ template or format your project requires.
  2. Get a quote with the price and delivery date before any work starts.
  3. We take off and structure the BOQ by trade, system and area.
  4. You receive the BOQ in Excel with marked-up drawings. Most projects are delivered within 24–48 hours; large ones can take longer.

Only need the counts and measurements? See our MEP quantity takeoff services. Need a full priced estimate? See MEP estimating services.

BOQ FAQs

What is the difference between a BOQ and a quantity takeoff?

A takeoff is the measuring and counting work. A BOQ is a formal document built from that takeoff, with numbered items, standard descriptions and units, laid out so several bidders can price the same scope in the same way.

Can you use our BOQ template?

Yes. Send your template or the format required by the bid documents and we will prepare the BOQ to match it.

Do you include fire protection and low voltage?

Yes, when they are part of your scope. Tell us which divisions to include in your request.

Request Your MEP BOQ

Upload your drawings on our contact page, email info@mepestimationservices.com or call +1 302-556-0442. Quotes are free.