Every MEP bid starts with the same step: finding out exactly what is on the drawings. That step is the MEP quantity takeoff. If the takeoff is wrong, the material list, the labor hours and the final bid are wrong too. This guide explains what an MEP takeoff is, what it includes for each trade, and how to check one before you bid.
What is an MEP quantity takeoff?
A quantity takeoff is a measured list of every item an installer will need to build what the drawings show. For mechanical, electrical and plumbing work, that means counting devices, fixtures and equipment, and measuring the length of every run of duct, pipe, conduit and wire. The takeoff becomes the base for material pricing, labor hours and, finally, the bid.
A takeoff is not the same as a full estimate. The takeoff answers “how much?”. The estimate adds “how much will it cost?” by pricing materials and labor.
What an electrical takeoff includes
- Light fixtures by type, switches, sensors and lighting controls
- Receptacles, special devices, boxes and floor boxes
- Panelboards, switchgear, transformers and disconnects
- Conduit by size and type, wire by gauge, and fittings
- Feeders, cable tray and low-voltage systems such as fire alarm and data
See our electrical estimating services for the full scope we cover.
What a plumbing takeoff includes
- Fixture counts by type and floor
- Domestic cold, hot and recirculation piping by size and material
- Sanitary, vent and storm piping, cleanouts and drains
- Gas piping and connections to equipment
- Water heaters, pumps, backflow preventers, valves and specialties
More detail is on our plumbing estimating services page.
What a mechanical (HVAC) takeoff includes
- HVAC equipment such as rooftop units, air handlers, split systems and VRF
- Supply, return and exhaust ductwork by size, gauge and material
- Fittings, dampers, diffusers, registers and grilles
- Hydronic and refrigerant piping, valves and insulation
- Controls and testing, adjusting and balancing where specified
See our mechanical & HVAC estimating services, or read our HVAC estimating guide for a full checklist.
Manual vs. digital takeoff
Takeoffs used to be done with printed drawings, a scale ruler and highlighters. Today most estimators work on PDF drawings in software such as PlanSwift, Trimble or Bluebeam Revu. Digital takeoff is faster, keeps a visual record of every count, and makes revisions easier when drawings change. The result is still only as good as the estimator’s understanding of the trade and the drawings.
Common takeoff mistakes to watch for
- Missing vertical runs between floors, such as risers and drops
- Ignoring the specifications, which can change materials or methods shown on the drawings
- Skipping details and schedules that list items not drawn on the plans
- Not checking addenda issued after the original drawings
- Wrong scale on a sheet, which throws off every measurement on it
How to check a takeoff before you bid
Ask for color-coded marked-up drawings with the takeoff. Spot-check a few rooms or one floor against the counts. Compare quantities per square foot with similar past projects. If something looks far off, ask the estimator to explain it before bid day, not after.