Skip to main content

MEP Estimation Services

Chicago MEP Estimating Services

MEP estimates priced for Chicago labor rates and Chicago code requirements

MEP Estimates Built for Chicago Projects

Chicago has its own construction codes, and its electrical rules differ from most of the country: metal conduit is required for most permanent wiring, which changes material and labor costs on every job. Add cold-weather heating systems, older building stock and union labor, and a generic national estimate can miss by a wide margin. We prepare MEP takeoffs and cost estimates for general contractors, MEP subcontractors and developers in Chicago and the surrounding suburbs.

Construction blueprints and laptop used for quantity takeoff

How It Works?

From the drawings you send to the estimate you bid with, our process is simple and fast. Here is how it works:

What we account for in Chicago estimates

  • Chicago Electrical Code (Title 14E): the city’s amended version of the NEC. Most permanent wiring must run in metal conduit such as EMT or rigid, and NM cable is generally not permitted, so we take off conduit, fittings, supports and the extra installation labor instead of pricing cable.
  • Rehab work in existing buildings: where the code allows flexible metal conduit or MC cable behind existing walls and ceilings, we price it that way and show it separately.
  • Chicago’s own plumbing code inside city limits, and the Illinois Plumbing Code for suburban projects, so fixture, piping and venting quantities match the jurisdiction.
  • Heating-heavy mechanical scope: boilers, hydronic piping, unit heaters, make-up air heating, freeze protection and pipe insulation for Chicago winters.
  • Older building stock: greystones, two-flats, courtyard buildings and loft conversions with existing-condition demolition and tie-ins.
  • Labor basis: union rates common in the city, open-shop rates where they apply in the collar counties, and Illinois prevailing wage on public works.
list.png

Send your plans

Upload PDF drawings and specs, or share a link to your bid documents.
Step 1
calculator.png

Get a quote

We confirm the scope, price and delivery date before any work starts.
Step 2
calendar.png

Takeoff and pricing

Our estimators measure, count and price every MEP item for your Chicago project.
Step 3
plumber.png

Receive your estimate

Get an Excel estimate and marked-up drawings, usually within 24–48 hours.
Step 4

Areas We Serve in and Around Chicago

We estimate projects in Chicago and across Cook, DuPage, Lake, Will and Kane counties, including Evanston, Oak Park, Schaumburg, Naperville, Aurora and Joliet.

Typical Chicago-area scopes we price include Loop and River North office fit-outs, mid-rise and high-rise multifamily, conversions of older masonry and loft buildings, restaurant build-outs, schools and healthcare work, and industrial and warehouse projects in the suburbs.

Request a Chicago MEP Estimate

Send your drawings and project details. We reply with a free quote and delivery date. Prefer to talk? Call +1 302-556-0442.

Chicago MEP Estimating FAQs

Do you price Chicago's conduit wiring requirements?

Yes. Our Chicago electrical takeoffs price the wiring methods the Chicago Electrical Code requires, rather than cable methods allowed elsewhere.

Do you estimate projects outside the city limits?

Yes. Suburban projects follow their own adopted codes, and we price each project to the jurisdiction shown on the drawings.

Can you include boiler and hydronic heating systems?

Yes. We take off boilers, pumps, hydronic piping, terminal units and related controls along with the rest of the mechanical scope.

Do you work with general contractors and subcontractors?

Yes. We estimate for general contractors, MEP subcontractors, developers and suppliers, for bids, budgets and change orders.

How quickly can I receive my estimate?

Most estimates are delivered within 24–48 hours. Large or complex projects can take longer, and we confirm the delivery date before we start.

What files do you need?

PDF drawings are enough to start. Specifications, schedules and CAD or Bluebeam files help us give you a more detailed estimate.

How do I request a quote?

Use the form on this page, email your plans to info@mepestimationservices.com, or call +1 302-556-0442. Quotes are free.

What will I receive?

An Excel estimate with quantities, material and labor pricing, plus color-coded marked-up drawings so you can check every count.

Industry Standards

✓ ASHRAE HVAC Standards
✓ International Code Council (ICC)